daryl abrams

Daryl Chester Abrams (Bubba)

Mailing add: 5178 Freeway Dr
Mobile Al 36619
Ph: 251-454-7162
e-mail: daryl.abrams@yahoo.com

Construction Field Engineer Civil/Structural

Daryl Abrams has more than 35 years of experience in the heavy industrial construction industry. His background includes power, pulp and paper, petrochemical, municipal airport, with additional experience in radiation control in the shipbuilding industry. He has served as a night shift project superintendent, discipline superintendent (civil, structural and mechanical), subcontract coordinator, field engineer, party chief, instrument man, and rodman

 

Supervisory Skills (24) Construction Safety (23)
Contract Management (20) Construction (17)
Project Control (17) Process Scheduler (16)
Subcontracting (13) Construction Management (13)
Project Estimation (11) Primavera P6 (11)
Inspection (10) Procurement (8)
EPC (7) Petrochemical (6)
Materials (6) Cost Control (6)
Project Planning (5) Concrete (5)
Power Plants (5) CPM Scheduling (5)
Contract Negotiation (4) Piping (4)
Change Orders (4) AutoCAD (3)
Cost Management (3) Engineering (3)
Project Engineering (3) Safety Management (3)
MS Project (3) Project Management (2)
Petroleum (2) Civil Engineering (2)
Microsoft Office (2) Project Coordination (2)
Proposal Writing (1) Occupational Health (1)
Power Point (1) Microsoft Word (1)
Budgets (1) Facilities Management (1)
Strategic Planning (1) Operations Management (1)
Team Building (1) Outlook (1)
Customer service (1) Microsoft Excel (1)
First Aid (1) Steel Structures (1)
Factory (1) Coordination (1)

Agrium Lone Star Project, Borger, Tx
Technical Services
Increase ammonia production capacity by 145,000 tonnes per year (t/y) to reach 635,000 t/y.
Add greenfield urea plant of 610,000 t/y
Chevron, Pascagoula, MS
Field Engineer
Pascagoula Base Oil Project.
Georgia Power, Juliette, GA
Technical Professional Leader – Structural
Plant Scherer FGD/SCR Project. Structural, electrical and mechanical prime. The Wet Flue Gas Desulfurization and Selective Catalytic Reduction projects at Plant Scherer Units 1 and 2 consist of the installation of electrical and instrumentation systems, mechanical systems, and SCR catalyst for the four SCR reactors, 136 catalyst modules per layer, two layers per reactor, two reactors per unit. Structural steel, including columns, posts/hangers, beams, horizontal bracing, trusses, vertical bracing, roof framing, monorails, handrails, grating, stairs, ladders and safety gates for the portion of the SCR reactor support above elevation 716 feet, SCR PEEC building (2), four FGD axial booster fans, and FGD flue gas ductwork. System booster fan area PEEC, absorber tower PEEC building, and Advatech recycle piping.
Georgia Power, Juliette, GA
Technical Professional Leader – Civil/Structural/Electrical/Paint/ Scaffold/ Subcontract
Plant Scherer SCR Units 1 & 2 heavy steel project. Erect 12,266 tons of heavy steel form grade to the flight deck – elevation 716 feet.
Solid Waste Authority, West Palm Beach, FL
Subcontract Coordinator
Engineering, procurement, and construction contract with both fixed and reimbursable components for the refurbishment of two RDF, trash burning boilers, including replacement of two precipitators with baghouses.

Georgia Power, Juliette, GA
Field Engineer
Plant Scherer Unit 3 pulse jet fabric baghouse project.
Enterprise Products Partners, Pinedale, WY
Field Engineer
Bridger compressor station project, Phases I and II.
Valero, Ardmore, OK
Field Engineer
TPI – Ultra-low-sulfur diesel project.
Olin Chemical Corp., McIntosh, AL
Field Engineer
Caustic barge unloading and salt brine purification system at existing facility.

Olin Chemical Corp., McIntosh, AL
Field Engineer
Engineering procurement and construction of a state-of-the-art, 250,000-tpy, membrane cell chlor-alkali plant. Utility and support areas included a 115-kVA substation, chlorine cooling and drying, chlorine liquefaction, hydrogen compression, chlorine and caustic loading, caustic storage, chlorine reconditioning, chillers, and cooling tower. All vessels and piping sized for 400,000-tpy production.
Chevron, Pascagoula MS
Field Engineer
Aromax Project.
CIBA, McIntosh, AL
Field Engineer
Chevron, Pascagoula MS
Field Engineer
Residuum Conversion Project.
International Paper, Courtland, AL
Subcontract Coordinator
New 4th level air system and annual inspection and repair work on No. 3 recovery boiler.
International Paper, Georgetown, SC
Subcontract Coordinator
Recovery and power boiler annual inspection and repair for four boilers, plus wall panel replacement capital work on two recovery boilers.
Boise Cascade, DeRidder, LA
Subcontract Coordinator
Supplemental maintenance and small capital project.
International Paper, Georgetown, SC
Subcontract Coordinator
28-day shutdown for the No. 1 and No. 2 recovery boilers. Panel replacement and annual inspection and repair. Implementing lump sum not-to-exceed subcontracts and coordinating between KBR and its subcontractors.
International Paper, Georgetown, SC
Subcontract Coordinator
Superheater replacement on No. 1 and No. 2 power boilers, including all new roof tubes, primary and secondary superheater and headers, plus chemical cleaning the entire main steam system to the 1450-lb. header. Implemented lump sum, not-to-exceed subcontracts and coordinated between KBR and its subcontractors.
International Paper, Vicksburg, MS
Subcontract Coordinator
Implemented lump sum, not-to-exceed subcontracts and coordinated between KBR and its subcontracts on a power and recovery boiler project.
International Paper, Courtland, AL
Subcontract Coordinator
Lower furnace replacement. Replaced entire bottom of the No. 3 recovery boiler.
Calpine, Decatur, AL
Subcontract Coordinator
Implemented subcontracts and coordinated between KBR and its subs to produce a lump sum, combined cycle, co-generation facility with 800 MW of generating capacity. Project consisted of three trains of HRSG-CTG-GSU combinations, capable of producing 185 MW each and one STG, with an extraction cycle capable of producing 240 MW and 1.2MM pph of 650-psig superheated steam; other necessary utilities and services required to operate the facility on a stand-alone basis. The project had TIC of $350MM, with over 1.2 million direct work hours.
Boise Cascade
Material Expediter
Procured and expedited material and equipment for the partial floor, sidewall, and frontwall replacement on the recovery boiler.
Georgia-Pacific, Cedar Springs, GA
Field Engineer
Boiler and electrical upgrade.
Gulfstream Park, Hallandale, FL
Clubhouse, jockey dorms, and truck upgrades.
CEMEX, Brooksville, FL
Field Engineer
Demolition and repair of No. 1 kiln preheater.
Smurfit-Stone Container Corp., Panama City, FL
Field Engineer
Provided engineering, procurement, and construction services for the implementation of the Cluster Rule Compliance project. The project included the construction of a new 30-tpd ClO2 plant, modifications to the existing bleach plant, condensate collection, and incineration.
Packaging Corp. of America, Counce, TN
Field Engineer
Engineering, procurement, and construction for major mill improvement and expansion, including 200-tpd recycle plant, stock preparation modifications, linerboard machine rebuild to increase production (including lightweight grades) and improve printability and DCS conversion.
International Paper, Selma, AL
Field Engineer
Engineering, procurement, and construction of a new 392-inch, 1093-tpd, fine paper machine, including stock prep, additives, roll handling, two cut-size sheeters, warehouse, 400-tpd deink plant, effluent and water treatment revamp, and utility pipe bridge.

Hartline Construction, Gulf Shores, AL*
Field Engineer
W. B. Riggins and Light House, Gulf Shores, AL*
Field Engineer
Champion Paper, Cantonment, FL
Field Engineer
E. O. Camble, Butler AL*
Tug Boat Engineer
Ingalls Ship Building, Pascagoula, MS*
Radiation Control Monitoring

  • Updated 8 years ago

To contact this candidate email daryl.abrams@yahoo.com

Contact using webmail: Gmail / AOL / Yahoo / Outlook /

Leave a Comment